StateCA-SB1168CA90%
Data centers: rate structures.
- Introduced
- In Committee
- Floor
- Enacted
EnergyGrid ReliabilityRatepayer
Policy mechanisms
Utility rate / large-load tariff
Signals: Power cost & ratepayer. Automated indicators, not legal analysis.
Why it matters
This state policy item is tracked because it connects data-center development to utility rate / large-load tariff. Its current status is Ordered to third reading.; use the linked primary source before drawing a legal or policy conclusion.
Summary
No summary available for this item.
Record quality
Primary source linkedSummary unavailableLast action datedClassification 90% relevance
Action history
- Aug 13, 2026Ordered to third reading.
- Aug 14, 2026Stage: introduced → floor
- Aug 14, 2026Status: Read second time. Ordered to consent calendar. → Ordered to third reading.
Status changes are recorded going forward as the tracker observes them.