← Back to dashboard
StateCA-SB1168CA90%

Data centers: rate structures.

Cosponsors0
StatusFloor
  1. Introduced
  2. In Committee
  3. Floor
  4. Enacted
EnergyGrid ReliabilityRatepayer

Policy mechanisms

Utility rate / large-load tariff

Signals: Power cost & ratepayer. Automated indicators, not legal analysis.

Why it matters

This state policy item is tracked because it connects data-center development to utility rate / large-load tariff. Its current status is Ordered to third reading.; use the linked primary source before drawing a legal or policy conclusion.

Summary

No summary available for this item.

Record quality

Primary source linkedSummary unavailableLast action datedClassification 90% relevance

Action history

  1. Aug 13, 2026Ordered to third reading.
  1. Aug 14, 2026Stage: introduced → floor
  2. Aug 14, 2026Status: Read second time. Ordered to consent calendar. → Ordered to third reading.

Status changes are recorded going forward as the tracker observes them.

Links