← Back to dashboard
Fed. Register2024-1087265%

Building for the Future Through Electric Regional Transmission Planning and Cost Allocation

SponsorEnergy Department
TypeFinal Rule
EnergyGrid ReliabilityRatepayerSiting & Land Use

Policy mechanisms

Disclosure & reportingGrid & interconnectionUtility rate / large-load tariff

Signals: Compliance & transparency · Power & grid · Power cost & ratepayer. Automated indicators, not legal analysis.

Why it matters

This regulatory action is tracked because it connects data-center development to disclosure & reporting, grid & interconnection, utility rate / large-load tariff. Its current status is Final Rule; use the linked primary source before drawing a legal or policy conclusion.

Summary

The Federal Energy Regulatory Commission (Commission) revises the pro forma Open Access Transmission Tariff (OATT) to remedy deficiencies in the Commission's existing regional and local transmission planning and cost allocation requirements. In this final order, the Commission requires transmission providers to conduct Long- Term Regional Transmission Planning that will ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs. The Commission also directs other reforms to improve coordination of regional transmission planning and generator interconnection processes, require consideration of certain alternative transmission technologies in regional transmission planning processes, and improve transparency of local transmission planning processes and coordination between regional and local transmission planning processes. These reforms are intended to ensure that existing regional and local transmission planning and cost allocation requirements are just, reasonable, and not unduly discriminatory or preferential.

Record quality

Primary source linkedSummary availableLast action datedClassification 65% relevance

Action history

  1. Jun 11, 2024Final order.

Status changes are recorded going forward as the tracker observes them.

Public comments

The public comment period is closed.

Read comments on Regulations.gov ↗

Links